Zuva Matlock 50kVA Solar System Installation
- ClientZuva Petroleum
- Category
- Start2025
- End2025
The Zuva Matlock project involved the installation of a 50kVA solar power system to supply clean and consistent energy. This system enhances operational efficiency while contributing to Zuva’s sustainability and renewable energy initiatives.
Related Project
This project delivered a 150kVA solar power system at the Zuva Makoni Simbisa site.…
The refurbishment of the Zuva Petroleum fuel storage depot in Hwange focused on upgrading…
The Chegutu service station was refurbished to improve functionality, safety, and customer experience. Work…
This project featured the installation of a 50kVA solar power system at Zuva Grange.…
This project involved the installation of a fully compliant LPG storage and distribution system…
The construction of the Rusape Zuva Service Station involved building a modern fuel station…
